Research covers a wide spectrum of Geotechnical Engineering. Projects include underground structures in rocks for energy and resource development, dams on rock foundations, soft ground tunnelling, and electrical strengthening of soft clays. Have published over 150 papers in refereed journals and conference proceedings. Received Best Paper Awards three times from the Canadian Geotechnical Society. Lectured in numerous national and international organizations including Trans Canada Tour and lecture tours in Europe, Japan and China. Served as keynote speaker and Chair at many Conferences. Legget Medal from Canadian Geotechnical Society 1989. Elected Fellow of Engineering Institute of Canada 1992. Winner of Keefer Medal from Canadian Society for Civil Engineers 1995. In recognition of his many contributions to the engineering profession the K.Y. Lo Medal Award has been established by the Engineering Institute of Canada 1997. Professional Engineers Medal for Research and Development 2006. 

SOME EXAMPLES OF TUNNELLING PROJECTS (ACTED AS SPECIALIST CONSULTANT AND EXPERT WITNESS)

 

Project

 

Clients

 

Year

Investigation, analysis, design and construction monitoring of Billy Bishop Tunnel (Island Airport)

 

Isherwood/EXP/Technicore

2011-2013

Assessment of design of Weston Tunnel

 

Isherwood/Kenaidan

 

2012-2013

Design and monitoring of King Street Tunnel

 

Isherwood/Kenaidan

2012-2013

Investigation of swelling in Chagrin Shale in Euclid Creek Tunnel, Cleveland, USA

 

Hatch Mott MacDonald (USA)

 

2009

Evaluation of rock swelling in La Higuera HEPP project tunnel, Chile

 

Golder Associates

 

2009

Conceptual design of intake and discharge tunnels for Nuclear Power Plant - Darlington "B"

 

SNC/Lavalin
Ontario Power Generation

 

2009

Site evaluation of Nuclear Power Plant - Darlington "B"

 

AMEC
Ontario Power Generation

 

2009

Design of soil/rock tunnels for a 3.5 km water main in Toronto

 

Trow International
City of Toronto

 

2008-2009

Evaluation of roof instability during construction of a large diameter tunnel

 

Ontario Power Generation

 

2008

Deep geologic repository - evaluation of swelling potential of host rocks Phase 1 and 2

Ontario Power Generation
INTERA

2007-2009

Investigation of a 10 km water conveyance tunnel in highly swelling shale in Kentucky, USA

 

Thelon Associates (USA)

 

2007-2008

Evaluation of interaction and impact of Simcoe St. tunnel (Enwave) on rail overpass structures at Union Station, Toronto

 

Morrison Hershfield

 

2006

Evaluation of "differing site conditions" and construction problems in a shaly formation in Tunnel "B" in Ohio, USA

MWH (USA)

2006

Determination of cause of cracking of Fletcher's Creek sewer tunnel

 

Golder Associates

 

2005

Development of thin spray-on liner for the application to concrete lining in TTC tunnels

 

Toronto Transit Commission

 

2004-2009

Panel of safety assessment of subway tunnels of Toronto Transit Commission for Yonge line, Bloor-Danforth and University lines

 

Toronto Transit Commission

 

2002-2008

Evaluation of construction problems and "differing site conditions" in tunnel "A" - Cleveland, USA

 

MWH (USA)

 

2002-2004

Final design of remedial measures for Heart Lake Tunnel

 

Morrison Hershfield
Golder Associates

 

2003-2004

Investigation and design of rehabilitation measures for Heart Lake tunnel Phase I

 

R.V. Anderson and Thurber

 

2002-2003

Investigation and preliminary design for the proposed Island tunnel in Georgian Bay shale

 

R.V. Anderson and Thurber

 

2001

GTAA - Pearson International Airport utility tunnels

 

Isherwood
Klohn Crippen

 

2000

TTC Yonge Line, Dundas Square at Yonge Street

 

Isherwood Associates

 

1999

Design of Lining for a 13 m diameter tunnel in swelling rock

 

Parsons Brinckerhoff

 

1999

Conceptual design of SABNGS III 13 m diameter 11 km long tunnel

 

Hatch Energy
Ontario Power Generation

 

1993-1998

         